Chinese translation for "hydroelectric resource"
|
- 水电资源
Related Translations:
hydroelectric: adj.水力发电的。 a hydroelectric power station 水力发电站。n.-tricity
- Example Sentences:
| 1. | The exploitable capacity of the hydroelectric resources is 1 . 21 million kilowatts , including 600 , 000 kilowatts potentials 水力资源可开发量121万千瓦,尚有60多万千瓦待开发。 | | 2. | With the great development of west china , a new prosperous period of water power exploitation in the rugged mountainous area of western china , where is rich in hydroelectric resources , is coming 随着西部大开发战略的实施,西部高山峡谷地区所蕴藏的丰富水能资源开发进入了新的高峰期。 | | 3. | Based on the circulation economic theory , this paper proposes a new idea of directing the development of hydroelectric resources economy of sichuan with the circulation principles , along with some concrete implementation ways 基于循环经济理论,提出用循环经济原理来指导四川水电开发的思路,并提出了具体的实施方式。 | | 4. | With the large - scale exploitation of hydroelectric resource in the west , the effects of severely cold , high humility and high altitude on the external insulation performance of overhead transmission line insulator will more and more server 随着水电资源的大规模开发,西部高寒、高湿及高海拔对输电线路外绝缘电气特性的影响将更加突出。 | | 5. | The enormous inexhaustible hydroelectric resources of the yangtze , producing no waste gases , no waste water , or waste residues , is superior to oilfields and coalfields and therefore considered the " king " of all energies capable of generating huge profits with a minimum input 取之不尽,用之不竭的浩瀚长江水资源,不是油田而胜似油田,不是煤田而胜似煤田。它既无废气废水废渣之公害,又是一本万利的再生能源之“王” 。 | | 6. | To expedite the exploitation of hydroelectric resources of huanghe upstream meets the request of western development , and is significant to the strategically overall arrangement of realizing the optimization deployment of resource and transporting clean energy to the east but , for a long time , in the electric market , the supply - and - demand analysis and the science - oriented , reliable forecast of electric network load is absent . in the developing gradation , the support of theory about hydroelectric plants " developing gradation is absent . in the pattern of management and development , a theoretical system of developing , management is absent , such as the relation of the synthetically utilization of hydroelectric development and water resource and environment should be brought into the unified planning and managing system of the valley 但是长期以来,在电力市场方面,缺乏科学、可靠的电网负荷需求预测及市场供需分析;在开发顺序方面,缺乏水电站开发顺序理论方法依据的支持,影响了开发的层次和速度;在开发管理模式方面,缺乏一套行之有效的开发、经营及管理的理论体系,比如水电开发与水资源综合利用及与生态环境的关系等,都应纳入流域统一规划、统一管理的水电开发利用管理体系中。 | | 7. | With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east " , the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight . the continuous completion and commissioning of large hydraulic power station , as well as the continuous increasing of extra - high voltage and long distance power transmission system , deteriorate the stability control problem of hydro - electricity system 随着三峡水电站的逐步建成和“西电东送”计划的实施,我国的水电开发进入了高速发展的时期,大型巨型水电站不断建成投运,超高压远距离输电系统不断增长,水电在我国电力系统中所占比重越来越大。 |
- Similar Words:
- "hydroelectric power section" Chinese translation, "hydroelectric power station" Chinese translation, "hydroelectric power station machinery" Chinese translation, "hydroelectric powre station" Chinese translation, "hydroelectric project" Chinese translation, "hydroelectric scheme" Chinese translation, "hydroelectric schemes" Chinese translation, "hydroelectric station operator" Chinese translation, "hydroelectric storage" Chinese translation, "hydroelectric structure" Chinese translation
|
|
|